Unknown statusMOD-26-00275'); // -->

MOD 3: SSD-10330 - Changes to the Electrical infrastructure to the Data Centre: In collaboration with the operational tenant at the site, as well as Ausconnex (subsidiary of Endeavour Energy, owner/operator of the high-voltage plant at part of the site), the project team have been conducting ongoing analysis of operational requirements to support the data centre. Subsequently, a fifth 132kV/11kV transformer, alongside the construction of an associated fifth switch room building is proposed to be developed within the existing high-voltage plant through a modification of SSD-10330 + Replacement of the existing Transformer 1 and 2.

Development application in Alongside The Construction Of An Associated Fifth Switch Room Building Is Proposed To Be Developed W, New South Wales · Blacktown City Council

Proposed development

Modification Application

Application details

Application number
MOD-26-00275'); // -->
Type
Modification
Category
Alteration/Addition
Lodged
1 July 2026
Council
Blacktown City Council

About this development application

A development application (DA) is lodged with Blacktown City Council when a property owner seeks consent to build, renovate, demolish, subdivide or change the use of a property in Alongside The Construction Of An Associated Fifth Switch Room Building Is Proposed To Be Developed W. This record is part of Council DA's database of 3.97 million development applications from 290+ Australian councils.

Tracking DAs like this one helps residents stay informed about neighbourhood change, and helps builders, agents and researchers understand local development trends.

MOD 3: SSD-10330 - Changes to the Electrical infrastructure to the Data Centre: In collaboration with the operational tenant at the site, as well as Ausconnex (subsidiary of Endeavour Energy, owner/operator of the high-voltage plant at part of the site), the project team have been conducting ongoing analysis of operational requirements to support the data centre. Subsequently, a fifth 132kV/11kV transformer, alongside the construction of an associated fifth switch room building is proposed to be developed within the existing high-voltage plant through a modification of SSD-10330 + Replacement of the existing Transformer 1 and 2. (MOD-26-00275'); // -->) — Development Application | Council DA